top of page
Ekran Resmi 2023-01-27 05.48.42.png

Ropeway & Foundations

Zomin Ropeway

Sector

Public

Location

Zomin, Uzbekistan

Year

2022

Responsibility

Design Chief

Softwares

Tekla Structures, SAP2000,

AutoCAD

Standards

ACI318,

ASCE07,

AISC360

In this project, I worked closely with the manufacturer, Bartholet (Switzerland). I designed top-bottom stations and ropeway column foundations. I worked as a design chief and performed both reinforced concrete and steel designs.

The rope has 300,00 Ib tension force which reveals the importance of top-lower station's foundations. Steel tonnage of top station is 200,00 Ib, lower station garage is  900,00 Ib and lower station together with transportation bridge is 240,00 Ib. 